• For service areas of the Tokyo Electric Power Company, Kyushu Electric Power Company, Tohoku Electric Power Company, Hokkaido Electric Power Company, Chubu Electric Power Company, Hokuriku Electric Power Company
In general, replacement work is required.
There is replacement work for ampere breakers (or limiters or contracted safety breakers). If a smart meter is installed, switching can be done remotely. If a main breaker needs to be installed or removed, please contact an electrical contractor directly and make arrangements.
• For service areas of the Kansai Electric Power Company, Chugoku Electric Power Company, and Shikoku Electric Power Company
Since ampere breakers are not installed, installation work by a General Electricity Transmission and Distribution Utility is generally not required.
If a main breaker needs to be installed or removed, Customers should contact an electrical contractor directly and make arrangements.